1 reviews | Active since Member
<p>I went to view house on 03/10/2016, lord I was excited imagine for the first time being a house owner. I told that my house ready, I just have to the final inspection. I submitted a notice at my flat ready to move in December. To my shock when I arrive to my house, the yard was dirty, the stope was not done and the piece was already missing, the main entrance door ( living room was damaged and some parts were lose ) I just looked cheap. The floor for the whole house is cracked. That was the beginning of the horror. I inspected the house, the plastering on the side walls is horrible never mind the outside the wall. Roof tiles are missing on one side of the house, the bathroom door have a hole in it. The corners are even worse.</p> <p>One of the workers is living in my house, the toilet is already turning brown inside. I was told that its not your responsibility to clean my hard but its responsibility to clean it. So it will be responsibility to clean the house as well ? after your company let someone stay in my house ? The builder is also using my house as the storage for the house that they are building next door. Maybe that the reason for the delay with my house.</p> <p>The guy that was helping at the site, putting pressure on me to sign the happy letter. Telling that municipality wont connect the electricity if I don’t sign the letter, saying that I might even move in Feb or March. Why because the delay is not my side.</p> <p> </p> <p>I can believe that I need to find a place to rent in December. :(</p> <p> </p>