1. Since 2018.09.20 the MD of Perfect Slate cc (PS) until 2019.05.23 has visited the site on 3 occasions at my request to view the bad workmanship of PS's so-called repair teams ...last PS "repair team" visit being on 2019.04.13 (being a Saturday).
2. On PS's MD's visit on 05/23 he identified as electronically recorded the following main aspects: 2.1. One area marked out by himself on his first visit to which no repair work had been done at all. 2.2. An 8m ridging repair quoted for but of which only 6 m had been done. 2.3 No broken tiles ( 100 "contracted for") had neither been replaced nor even delivered on site. 3. PS's MD was shown other areas of bad workmanship and proof of visibly deliberate damage of imported Canadian pine brandering. 4. Substantial consequential damage has occurred to ceilings at areas referred to in paras 2.1 and 2.2 above....him promising refunding the cost of replacement of the ceilings (already replaced..photos of the damage/collapsed ceilings were shown and given to him). 5. Since the MD's visit on 05/23 and despite all his promised follow-up actions NOT A SINGLE ONE HAS MATERIALISED! 6. From 2018.09.20 till 2019.05.39 Perfect Slate cc 's repair teams DID NOT ARRIVE on 12 out of 18 scheduled visits to repair site.
SO MUCH FOR THE ADVERTISED PROFESSIONAL MANAGEMENT AND REPAIR SERVICE OF PERFECT SLATE cc.
More details are documented.