1 reviews | Active since Member
Written on behalf of a friend: Terrible experience using Seven Seas Pools. Initially I was told that the pool would take 2 weeks to complete. It was finished in over 5 weeks but was done poorly. Pipes exposed above the ground, the pool has been built up above the initial level of the ground. There is a leak that is yet to be fixed and a hole has been left for two weeks where they dug to try and fix the leak which has still not been done. Johan got aggressive with me when I told him that the job has not been done nicely. Shocking.