Mondit projects (pty) Ltd
TrustIndex
0
Ranking
#2
in Other
NPS Score
0
Recommended: Unlikely
Used this business recently? Share your experience to help others decide.
Used this business recently? Share your experience to help others decide.
Share Your Experience1 reviews | Active since Jan 2020
Progress Moyo, I wish I looked at the reviews before dealing with him. All 1 star reviews. Unreliable, took me on a run around for almost 2 years on a roof they fixed with 20 year gaurantee, they didnt want to uphold and kept telling us they coming. Do not reccommend at all, rather pay a reputable company to do the work, not worth it.
1 reviews | Active since Jan 2020
Progress Moyo, I wish I looked at the reviews before dealing with him. All 1 star reviews. Unreliable, took me on a run around for almost 2 years on a roof they fixed with 20 year gaurantee, they didnt want to uphold and kept telling us they coming. Do not reccommend at all, rather pay a reputable company to do the work, not worth it.
1 reviews | Active since Jan 2020
Appeared to know what he was doing but things quickly went downhill. Poorly laid tiles were blamed on floor surface, but even the bedrooms and lounge that he applied screed and therefore he was responsible had issues. After the screed he inflated his cost for surface removal (tiled areas) in preparation for tiling sqm by 19% and even included the areas he laid screed. A measurement showed this up, during measuring I also spotted one of his workers insert his shoe under the tape measure and lift it thereby increasing the distance, incidentally this was in the bathroom which he later stated i mentioned should not be included until I showed him the whattapp message specifically mentioning they were included. Tiles were laid with obvious lips, skew, his workers also walked over newly laid tiles shifting them . He was most defensive when issues were raised, accepting no responsibility other than appearing to reluctantly fix items, one particular tile had to be laid 4 times on my insistence, another around a door area looked as if someone had used a pliers to snip it as it had jagged edges. Grouting was not complete and in some areas over use. My angle grinder was used and when i found it the grinder was in one of the rooms, the safety guard which had been removed I found a few days later lying outside. Cement finger marks were left on walls, property was damaged, a dozen beers I had mysteriously disappeared, some items of clothing were used to wipe floors and left lying around. Punctuality was also an issue, he would arrive any time from 8am to 2pm, Sloppy is best I can summarize his work, he has no business being involved in construction. I've had to hire another tiler to install/fix the work he was contracted to do as I refuse to allow him back.
1 reviews | Active since Jan 2020
Appeared to know what he was doing but things quickly went downhill. Poorly laid tiles were blamed on floor surface, but even the bedrooms and lounge that he applied screed and therefore he was responsible had issues. After the screed he inflated his cost for surface removal (tiled areas) in preparation for tiling sqm by 19% and even included the areas he laid screed. A measurement showed this up, during measuring I also spotted one of his workers insert his shoe under the tape measure and lift it thereby increasing the distance, incidentally this was in the bathroom which he later stated i mentioned should not be included until I showed him the whattapp message specifically mentioning they were included. Tiles were laid with obvious lips, skew, his workers also walked over newly laid tiles shifting them . He was most defensive when issues were raised, accepting no responsibility other than appearing to reluctantly fix items, one particular tile had to be laid 4 times on my insistence, another around a door area looked as if someone had used a pliers to snip it as it had jagged edges. Grouting was not complete and in some areas over use. My angle grinder was used and when i found it the grinder was in one of the rooms, the safety guard which had been removed I found a few days later lying outside. Cement finger marks were left on walls, property was damaged, a dozen beers I had mysteriously disappeared, some items of clothing were used to wipe floors and left lying around. Punctuality was also an issue, he would arrive any time from 8am to 2pm, Sloppy is best I can summarize his work, he has no business being involved in construction. I've had to hire another tiler to install/fix the work he was contracted to do as I refuse to allow him back.
1 reviews | Active since Jan 2020
Mondit Project owner Progress moyo was contracted for construction of my home & garage. He requested an upfront payment of 50% of the fee to acquire materials which i gave him as this is nornal in construction. He disappeared with my money. he has moved from his business address in revalea (JHB) and his phone goes unanswered. He is from Zimbambwe and a criminal. the police can not track him as he an illegal immigrant.
1 reviews | Active since Jan 2020
Mondit Project owner Progress moyo was contracted for construction of my home & garage. He requested an upfront payment of 50% of the fee to acquire materials which i gave him as this is nornal in construction. He disappeared with my money. he has moved from his business address in revalea (JHB) and his phone goes unanswered. He is from Zimbambwe and a criminal. the police can not track him as he an illegal immigrant.
© Copyright 2026 hellopeter.com and its affiliates. All rights reserved.